Oregon, like many states, has a statute of repose (“SOR”) that sets a time frame in which product liability lawsuits must be filed. Prior to 2009, ORS 30.905(2), the statute governing Oregon’s SOR, set an 8 year limitation period that started to run when the product was first purchased for use or consumption. The rule...
The Denver office of Cozen O’Connor recently arbitrated a construction defect caused subrogation loss which occurred during a remodel of a high end vacation residence where the insured and the general contractor had entered into an AIA form agreement, including the standard general conditions. As expected, the general contractor raised the subrogation waiver contained in...
 The author of the following blog post, Robert Sottile, is an Articling Student with Cozen O’Connor. The recent decision of the Alberta Court of Queen’s Bench in Bernum Petroleum Ltd v Birch Lake Energy Inc (Bernum)[1], outlines the requirements to establish gross negligence in losses involving the drilling and operation of oil wells. Background In...